HR Execs on the Move

Nouveau Monde

www.nouveaumonde.ca

 
Nouveau Monde Graphite is set to become a key operator in the sustainable energy revolution. The Company is developing the only fully integrated source of green battery anode material in North America. Targeting full-scale commercial operations by early 2023, the Company will provide advanced carbon-neutral graphite-based material solutions to the growing Lithium-ion and fuel cell markets. With low-cost operations and the highest of ESG standards, Nouveau Monde Graphite will become a strategic supplier to the world`s leading battery– and automakers, ensuring robust and reliable advanced material while guaranteeing supply chain traceability.
  • Number of Employees: 100-250
  • Annual Revenue: $10-50 Million
  • www.nouveaumonde.ca
  • 331 Rue Brassard
    Saint-Michel-des-Saints, QC CAN J0K 3B0
  • Phone: 450.757.8905

Executives

Name Title Contact Details
Philippe Legault
Vice President of Human Resources Profile

Similar Companies

Arizona Lithium

Arizona Lithium Limited (ASX:AZL) (Arizona Lithium, AZL or the Company), a company focussed on the sustainable development of the Big Sandy Lithium Project (Big Sandy, Project) in Arizona.

Johnston

Johnston is a East Branch, NY-based company in the Agriculture and Mining sector.

Maine Drilling and Blasting

Maine Drilling and Blasting is a Gardiner, ME-based company in the Agriculture and Mining sector.

West Ok Trucking Inc

West Ok Trucking Inc is a Woodward, OK-based company in the Agriculture and Mining sector.

Silver Bear Resources

Silver Bear is focused on the development of its wholly-owned Mangazeisky Silver Project, covering a licence area of ~570 sq km that includes the high grade Vertikalny deposit (amongst the highest grade silver deposits in the world) located 400 km north of Yakutsk in the Republic of Sakha within the Russian Federation. The Company was granted a 20-year mining licence for the Vertikalny deposit in September 2013 and completed a Preliminary Economic Assessment in February 2014. The Feasibility Study, scheduled for completion in H2 2015, is contracted to Tetra Tech in the UK with SRK and ERM as subcontractors for the mining and environmental studies respectively.